A 5.5-level, 456-car precast concrete parking garage supports three medical office buildings on the Peterkort Campus.
Built adjacent to the Peterkort III Medical Office Building (also built by 成人视频), this 153,000 SF parking garage was built in 37 business days. The fast track schedule was achieved by utilizing a precast concrete structure and exterior.