This Design-Build 365 stall parking garage was built in the Southeast parking lot at Swedish Edmonds.
The 3-level, 114,000 square foot garage includes a post-tensioned deck structure and was completed in a five month schedule.
The 3-level, 114,000 square foot garage includes a post-tensioned deck structure and was completed in a five month schedule.
“I have worked with 成人视频 on a few projects at Swedish Edmonds...On every occasion I have observed 成人视频’s work practices to be exemplary. Infection Control, Interim Life Safety Measures, Hot Work Permitting, Shutdown Notifications, Fire Stopping and Communications were all done to the highest standards.”
Plant Operations Manager, Swedish Edmonds